Padel Court Foundation (On Ground)

THB 420,000.00

A reliable on-ground foundation system, built with reinforced concrete and leveled finish for padel courts. Best suited for stable land with minimal soil movement.

Size: 10m x 20m (200 m²)

Installation: ~2 weeks

Benefit: Faster installation and cost-effective solution.

A reliable on-ground foundation system, built with reinforced concrete and leveled finish for padel courts. Best suited for stable land with minimal soil movement.

Size: 10m x 20m (200 m²)

Installation: ~2 weeks

Benefit: Faster installation and cost-effective solution.